论文部分内容阅读
每当国家有新的移民条例出台,都会给移民工作带来新的发展。在2006年国务院公布实施《大中型水利水电工程建设征地补偿和移民安置条例》(中华人民共和国国务院令第471号)后,水利水电工程可行性研究阶段建设征地移民安置规划设计工作的总体设计原则、程序、内容和深度等有了很大的改变。主要对《大中型水利水电工程建设征地补偿和移民安置条例》实施后可行性研究阶段建设征地移民安置规划设计工作程序进行初步探讨。
Whenever a new immigration regulation is introduced in the country, it will bring new development to the immigration work. After the State Council promulgated the “Regulations on Land Acquisition Compensation and Resettlement for Large and Medium-sized Hydraulic and Hydropower Projects” (Order No. 471 of the State Council of the People’s Republic of China) issued by the State Council in 2006, the overall design principles for the planning and design of land acquisition and resettlement for the feasibility study period of water conservancy and hydropower projects , Procedures, content and depth have changed a lot. Mainly on the “large and medium-sized water conservancy and hydropower project construction land requisition compensation and resettlement regulations” after the feasibility study stage of construction land acquisition and resettlement planning and design of the work process to conduct a preliminary discussion.