广州抽水蓄能电站动能设计回访工作,是通过对1994年广东电力系统实际情况调研进行的,目的是检验初步设计所依据的系统背景是否切合实际。调查结果表明该电站的设计效益在1994年的运行中没有得以全部实现,原因是体制和管理问题。回访的结论是:广蓄的动能经济设计基本切合实际,只要管理体制顺畅,电网具有实现全部效益的潜力。
Guangzhou Pumped Storage Power Station kinetic energy design of the return visit, through the actual situation in Guangdong power system in 1994 conducted a survey, the purpose is to test the preliminary design based on the system background is realistic. The survey results show that the design benefits of the power station have not been fully realized during the operation in 1994 due to the problems of system and management. The conclusion of the visit is: The broad-based kinetic energy economy design is basically in line with reality. As long as the management system is smooth, the power grid has the potential to realize all the benefits.