论文部分内容阅读
斯里兰卡现有的一个电厂和正在建设中的那些电厂都位于Mahaveli和kelani河盆地,由于这些盆地受到西南和东北季风的不同影响,它们有不同的径流模型,本文证明这两个盆地的随机控制解是可以得到的。这个解可以估计包括控制问题序列相关的值。
An existing power plant in Sri Lanka and those currently under construction are located in the Mahaveli and Kelani river basins. Because these basins are affected by the influence of the southwest and northeast monsoons, they have different runoff models. This paper demonstrates the stochastic control solutions for these two basins. It is available. This solution can be estimated to include the values associated with the control problem sequence.