论文部分内容阅读
施工成本控制是一个动态的过程,贯穿于工程建设的过程中。本文将结合钦州港大榄坪3#~8#泊位后方陆域一期工程施工实例,从港口工程设计阶段的造价控制工程项目进行成本控制的影响,以及港口工程设计阶段造价控制存在的问题,具体的控制方法,基于设计阶段的港口施工项目成本控制分析。
Construction cost control is a dynamic process that runs through the construction process. This article will combine Qinzhou Port Tai Lam Ping 3 # ~ 8 # Berth Phase I land engineering construction example, from the port engineering design phase cost control project cost control, as well as port engineering design stage cost control problems, specific Control method, based on the design phase of the port construction project cost control analysis.