1965年我处进西南以来,为了适应桥梁建设圬工量大、工地流动分散的特点,我处的三个工程队均投入了一定的力量,对这项占用劳动力多、劳动强度高、卫生条件差的混凝土工厂进行了多次改革。除水泥外,混凝土工厂基本上结束了人工喂料的落后局面,朝混凝土工厂机械化的道路上迈出了一大步。1973年,我处的三个工程队集中于洛阳,兴建洛阳黄河公路大桥。为了使混凝土工厂进一步改进、完善和
Since I entered the southwest in 1965, in order to adapt to the huge amount of construction work in bridge construction and the scattered flow of construction sites, all three engineering teams in our department have invested a certain amount of power in this project. This project occupies a large amount of labor, high labor intensity, Poor concrete factory conducted several reforms. In addition to cement, the concrete factory basically ended the backwardness of manual feeding and took a big step toward the mechanization of the concrete factory. In 1973, the three engineering units in our department focused on Luoyang and built the Luoyang Yellow River Highway Bridge. In order to further improve the concrete factory, perfect and