论文部分内容阅读
针对灰土挤密桩的设计与施工特征,结合位于湿陷性黄土区的郑西客运专线工程实际,详细介绍了灰土挤密桩的设计、施工工艺及质量检测方法,并提出了详细的安全与环保措施。
Aiming at the design and construction features of lime-soil compaction piles, the design, construction technology and quality testing methods of lime-soil compaction piles are introduced in detail in combination with the engineering practice of Zhengzhou-Xi’an Passenger Dedicated Line located in collapsible loess area. A detailed safety and Environmental protection measures.