介绍了在上海外高桥港区五期工程H986扫描大厅建设中,要求整个扫描大厅墙板连同柱体分两段一次浇注到顶,不得留置水平和竖向施工缝,不得留置模板用的预留孔,浇注成型的砼,除涂刷涂料外,不得作其他处理。根据这一要求,而进行模板设计的和浇注工艺。
The construction of H986 scanning hall of the fifth phase of Waigaoqiao Port Area in Shanghai is introduced. It is required that the entire scanning hall wall plate be pumped into the top along with the columns in two stages, the horizontal and vertical construction joints should not be reserved, and the reservoirs should not be reserved Hole, pouring concrete, in addition to brushing paint, shall not be other treatment. According to this requirement, and the template design and pouring process.