吕家坨矿选煤厂101带式输送机是该选煤厂原煤准备系统第一条胶带,带宽1 200 mm,带长112.6 m,带速1.6 m/s,为单系统运行,担负原煤入选运输的重任。因井下随原煤提升上来的杂物及铁器等较多,严重影响了胶带的正常运行,并直接对槽体、胶带等造成破坏。因此于2005年初在101带式输送机机头安装了RCYD-12 T2型悬挂式永磁自卸式除铁器,虽然取得了一定的效果,但由于除铁器胶带的运行速度远远高于运煤带式输送机的实际带速,造成混杂在煤内的金属杂物不能完全被吸出,同时吸出
Lujitutuo Coal Preparation Plant 101 Belt Conveyor is the first tape in coal preparation system of this coal preparation plant with a belt width of 1 200 mm and a belt length of 112.6 m with a belt speed of 1.6 m / s. It is a single-system operation with raw coal selection Transportation of the task. Due to downhole with the raw coal up debris and more iron, etc., seriously affected the normal operation of the tape, and directly to the tank, tape and other damage. Therefore, in early 2005 in the belt conveyor head 101 installed RCYD-12 T2 hanging permanent magnet dump iron, although achieved some results, but because of the speed of the separator tape is much higher than coal transportation Belt conveyor with the actual belt speed, resulting in mixed with coal in the metal debris can not be fully sucked out, while sucking out