论文部分内容阅读
CARR导流箱是堆本体结构的重要部件,位于堆水池中水面以下约10 m处,主回路冷却剂管道直接与其相连,底部支撑堆芯容器的上端,上盖板组件上固定有19根垂直孔道和2根安全棒导管。
The CARR diverter is an important part of the stack body construction and is located approximately 10 m below the surface of the water in the reactor pool. The main circuit coolant conduit is directly connected to it and the bottom supports the upper end of the core container. The upper deck assembly holds 19 vertical Channel and 2 safety rod catheters.