论文部分内容阅读
广东省水利学会勘测设计专业委员会于1989年4月21日至23日结合飞来峡水利枢纽勘测设计中的几个问题进行学术交流。参加活动的肴省水利学会和勘测设计专业委员会的负责同志以及省水利电力勘测设计院、珠江水利委员会勘测设计院的专业人员共30余人。会上由珠委的同志通报了飞来峡水利枢纽勘测设计情况。这项工作是在省水电院原来工作的基础
Survey and Design Committee of Guangdong Provincial Institute of Hydraulic Research, from April 21 to April 23, 1989, conducted academic exchanges in connection with several issues in the survey and design of Feilaixia Hydropower Project. Responsible comrades of the Provincial Water Conservancy Society and Survey and Design Professional Committee participating in the activity, together with more than 30 professionals from the Provincial Water Resources and Electric Power Survey and Design Institute and the Pearl River Water Conservancy Commission Survey and Design Institute. At the meeting, comrades from the Pearl Committee informed the investigation and design of Feilaixia Water Conservancy Project. This work is the basis for the original work of the Provincial Hydropower