论文部分内容阅读
中国移动在13年获得全业务运营牌照后,大力建设有线接入网络支撑固网业务接入,同时开始探索融合接入层基站光缆网和用户光缆网形成一张光缆接入网,实现基础资源充分复用。本文针对一张光缆网建维工作中的典型问题,提出了贯通规划、建设、维护全过程的管理方案,并通过IT系统在关键环节设定强约束条件,确保一张光缆网工作切实落地。
After obtaining its full-service license in 13 years, China Mobile vigorously built the wired access network to support the access to the fixed-line service and began to explore the integration of the access-layer base station optical cable network and the user optical cable network to form a fiber optic cable access network to realize the basic resources Fully multiplexed In this paper, aiming at the typical problems in the construction of a fiber optic cable network, a management plan is put forward which is through the whole process of planning, construction and maintenance. IT systems are set up with strong constraints at the key points to ensure that a fiber optic cable network can work effectively.