论文部分内容阅读
本文阐述了火力发电厂循环水压力管水压试验的必要性 ,并对接头水压试验和全长 (分段 )水压试验方法作了较为详细的介绍 ,以供参考
This paper elaborates the necessity of hydraulic pressure test of circulating water pressure pipe in thermal power plant, and introduces the hydraulic pressure test and the full length (sub-pressure) test method in detail for reference