地质勘探工作,主要是在野外矿区进行。野外施工,要受自然条件的影响。因此,地质勘探单位在组织野外施工时,必须根据施工需要和各地不同的自然条件,做好施工前的各项准备工作。如兴建职工临时居住或办公用的简易房屋;平整施工场地;架设通讯输电线路;安装和拆迁施工设备、设施以及工作地转
Geological exploration work is mainly carried out in the wild mining area. Field construction is affected by natural conditions. Therefore, when the geological prospecting organization organizes the field construction, it must do all the preparatory work before construction according to the construction needs and the different natural conditions in different regions. Such as the construction of temporary housing for temporary residence or office workers; leveling of construction sites; erection of telecommunications transmission lines; installation and demolition of construction equipment, facilities and work sites