介绍了云南省鲁地拉水电站大坝工程拌和系统设计的主要要求,以及依据要求和特点对拌和系统的平面进行布置和设备选型配置。该系统平面布置及设备配置应做到因地制宜,以满足大坝高峰期生产以及较大程度上考虑均衡生产。
This paper introduces the main requirements of the design of the mixing system of dam engineering in Ludila Hydropower Station in Yunnan Province, as well as the plane layout and equipment selection and configuration of the mixing system according to the requirements and characteristics. The system layout and equipment configuration should be done according to local conditions to meet peak dam production and to a large extent consider balanced production.