ADS先导专项的注入器II计划在将质子束通过一个Cryomodule加速到5 Me V后,进行10 m A连续束流的调试,以验证ADS低能段的强流超导直线加速器技术。为了将50 k W的束流功率沉积到束流垃圾站,需要搭建一条高能束流传输线,从超导段开始传输束流。采用两套三组合四极透镜控制束流包络及垃圾站的束流尺寸,利用诊断真空室进行水平和垂直发射度的测量。为避免束流产生的真空管道损伤,该传输线必须确保束流无损失地传输到垃圾站。
ADS Pilot Special Injector II plans to commission a 10 m A continuous beam after accelerating the proton beam through a Cryomodule to 5 MeV to validate the high-flow superconducting linear accelerator technology for the low energy segment of the ADS. In order to deposit a beam power of 50 kW into a waste dump, a high-energy beamline needs to be built to transmit the beam from the superconducting section. Two sets of triple quadrupole lenses are used to control the beam envelope and the beam size of the refuse collection station. The horizontal and vertical emittance measurements are made using a diagnostic vacuum chamber. To avoid damage to the vacuum piping caused by the beam, the transmission line must ensure that the beam is delivered to the dumpster without any loss.