前言泉水双曲拱坝根据坝址特点,选用了两岸坝肩溢洪道、断面经济、工程量最省的坝型。广东省水电局所属第三工程局发扬自力更生精神,土法上马,仅以一年多的时间建成大坝。1976年1月在正式投入运行之前,广东省水电局邀请了省内外十九个单位,组成三结合的蓄水试验小组,开展了蓄水观测工作。本文着重介绍蓄水观测资料分析成果,见参考文献九、十、十一、。参加试验的单位有:广东省水电局、广东省水电勘测设计院、广东省水利水电科研所、南
Preface Spring double curvature arch dam according to dam characteristics, the selection of the two sides of the dam spillway, section economy, most projects of the dam type. The Third Engineering Bureau of Guangdong Provincial Bureau of Hydropower to carry forward the spirit of self-reliance, native law launched, only more than a year to complete the dam. Before its formal operation in January 1976, the Guangdong Provincial Bureau of Hydropower invited 19 units inside and outside the province to form a three-tiered water storage test group and carried out water storage observation. This article focuses on the results of water storage observation data analysis, see references nine, ten, eleven. Participate in the pilot units are: Guangdong Provincial Bureau of Hydropower, Hydropower Survey and Design Institute of Guangdong Province, Guangdong Provincial Institute of Water Resources and Hydropower, South