论文部分内容阅读
中国原子能科学研究院将基于强流回旋加速器综合试验装置——10MeV中心区实验台架(CRM)新建1条注入能量为40keV的脉冲化注入线,进行脉冲化实验研究。根据脉冲化的具体
China Institute of Atomic Energy will build a pulsed injection line with an energy of 40 keV based on the strong current cyclotron integrated test device - 10 MeV Central Experimental Station (CRM), and conduct pulsed experiments. Depending on the specifics of the pulse