论文部分内容阅读
本文主要结合风沙路基段的路基填筑工艺要求,对风积沙路基主体及土工格栅加筋施工工艺,以及风积沙路基施工的施工工序、机械选型、路基填筑及压实施工方法进行了详细介绍。
In this paper, combining with the requirements of roadbed filling for sand-blown subgrade, the construction process of aeolian sand embankment main body and geogrid reinforcement, as well as the construction process, mechanical selection, subgrade filling and compaction construction method of aeolian sand embankment construction Have carried on the detailed introduction.