现浇多层钢筋混凝土框架结构形式,目前已在工业与民用建筑中被广泛采用。但这种结构的原施工工艺,难度大,工期长。采用先安板,后浇灌施工新工艺,可以缩短施工周期。具体施工方法如下。1.先安后浇法
Cast-in-place multi-storey reinforced concrete frame structures are currently widely used in industrial and civil buildings. However, the original construction process of this structure is difficult and has a long construction period. The use of Xian’an plate and post-irrigation of new construction techniques can shorten the construction period. The specific construction method is as follows. 1. After the first pouring method