论文部分内容阅读
在安太堡露天煤矿原煤开采工艺系统改造设计中,经过方案比较提出了单斗-卡车-破碎站-带式输送机原煤开采工艺(见本刊 2000 年第 3 期)。论述了该开采工艺的系统布置,以使系统改造方案更为详细具体并付诸实施。
In the reform and design of raw coal mining technology system of Antaibao open-pit coal mine, the coal mining technology of single-bucket-truck-crushing plant-belt conveyor was put forward through comparison of schemes (see No. 3 of 2000). The system layout of the mining process is discussed in order to make the system reform plan more specific and put into practice.