论文部分内容阅读
第二重型机器厂建厂20多年来,在材料管理体制上,前期实行厂供应部门一级管理(分片设立材料供应站),近10多年实行厂、车间二级管理。但长期以来,以领代耗、“吃大锅饭”的问题始终没有解决。1982年该厂对车间材料管理作了以下改进,并取得了初步的成效。一、改革材料发放制度,实行凭证出库。多年来,该厂绝大多数车间的材料发放无凭证,采用在账上签字出库的办法。这种办法对简化手续、方便群众有好的一面,但随之而来的是用料无
The second heavy machinery factory has been established for more than 20 years. In the material management system, the first-level management of the factory supply department has been implemented (separate sets of material supply stations). In the past 10 years, two levels of plant and workshop management have been implemented. But for a long time, the problem of leading generation consumption and “eat big pot of rice” has not been resolved. In 1982, the plant made the following improvements to the workshop material management and achieved preliminary results. First, the reform of the material distribution system, the implementation of the certificate out of the library. For many years, most of the workshop’s materials were issued without certificates, and the method of signing and leaving the accounts was adopted. This approach has a good side to simplifying procedures and facilitating the people, but it comes with the use of materials