现阶段,社会经济的发展速度不断加快,而水利水电工程的建设也取得了理想的成绩。但是,水利水电工程的建设成本很高,且施工的时间相对较长,为此,有必要对建设成本予以合理控制,只有这样才能够有效提高建筑企业经济效益,而最关键的就是造价结算与审核。文章与实践经验相结合,针对新阶段背景下水利水电工程造价的审核问题展开了相应的探讨,并提出了具有可行性的对策,以供参考。
At this stage, the social and economic development continues to accelerate, and the construction of water conservancy and hydropower projects has achieved satisfactory results. However, the construction cost of water conservancy and hydropower projects is very high and the construction time is relatively long. For this reason, it is necessary to control the construction costs reasonably. Only in this way can the economic benefits of construction enterprises be effectively raised. The most important thing is the settlement of construction costs Audit. This paper combines the practical experience and the article, discusses the audit of water conservancy and hydropower project cost under the new stage background, and puts forward the feasible countermeasures for reference.