随层预制垃圾道板的施工方法

来源 :建筑工人 | 被引量 : 0次 | 上传用户:ableper
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
为彻底根治预制垃圾道板接头处的横向裂缝,我们对传统作法进行如下改进。1.预制垃圾道板时,将每层的垃圾道板做成一块,竖向安装,使层与层间垃圾板接缝位置正好位于每层的休息平台处,因为垃圾道板中间不存在接头,也就从根本上杜绝了裂缝的出现。2.采用此法施工预制件的运输不太方便。为解决这个问题,我们采用了随层预制的方法。也就是说,哪一层用的垃圾道板就在哪一层预制。3.待主体施工完毕和楼梯扶手施工前,即进行 In order to completely eradicate the horizontal cracks in the prefabricated landrafts joints, we make the following improvements to the traditional methods. 1. When prefabricating the garbage road boards, make the garbage road boards of each floor into one piece and install them vertically so that the seams between the layers and the floors are located at the rest platform of each floor, because there is no joint in the middle of the garbage road boards , Also fundamentally put an end to the emergence of cracks. 2. The use of this method of construction of prefabricated transport is not easy. To solve this problem, we adopted a method of prefabrication with layers. In other words, which layer of rubbish plywood is prefabricated. 3. Until the main construction is completed and the staircase handrail construction, that is
其他文献
西安地铁二号线采用盾构法施工,沿西安市南北中轴线,要先后4次下穿明城墙,2次旁穿钟楼,文物保护是施工中面临的重大课题之一。施工前期采取对护城河堆载反压,对城墙和钟楼布
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
由上海市鑫鑫房地产公司开发,台湾三兴联合建筑师事物所设计,由两座塔楼 (A楼、 B楼 )组成,地下一层,地上十四层,建筑物总高度 44.40m,建筑总面积 21 150 m2,现浇钢筋混凝土框架-剪力
上海光源工程是实施科教兴国战略、加快国家创新体系建设的一项标志性工程,对提高我国生命科学、材料科学、环境科学等领域的研究和创新能力,在世界高科技领域占有一席之地具
期刊
利用炉渣制作空心砌块代替粘土砖、加气混凝土砌块已广泛用于多层、高层框架结构的填充墙中,节约了大量土地资源。但是,因构造不合理和施工方法不当等原因,会使建筑物墙体出
中国的石文化源远流长,近年来,尤其是改革开放30年来,我国两个文明建设和经济的腾飞,推动和促进了观赏石理论与文化的发展,呈现出空前繁荣的可喜局面。然而,在这繁荣景象的背
本单位一台日立EX1100型反铲挖掘机在进行作业面转移过程中发生左行走马达损坏事故,马达体损坏情况见图1。经拆检发现: Hitachi EX1100 backhoe excavator of this unit in
期刊