某变电所建于黄土状盐渍土场地,投产之后即有所内道路、地坪出现裂缝、沉陷等现象,在经过多雨夏季和严寒冬季的一年运行之后,地基变形进一步加剧,一些构架、设备基础倾陷,以至陆续产生了上部设备事故,直接影响安全运行。经过全面开剖检测,发现绝大多数地基变形系由湿陷、溶陷、冻胀、灰胀、盐胀等共同作用所造成,产生这些问题的直接原因,系施工单位未认真按设计图纸施工以及基坑回填土质量严重不合格,而相关的设计方和监管方也有值得反省的地方。
A substation built in the loessial saline soil site, put into operation after the road, floor cracks, subsidence and other phenomena, after a rainy summer and frosty winter year after operation, the deformation of the foundation further aggravate some of the framework, The basic equipment has been collapsed, resulting in the accident of the upper equipment one after another, which has a direct impact on the safe operation. After a thorough open-cut test, it is found that most of the deformation of foundation is caused by the common action such as collapsing, dissolving, frost heaving, swelling and salt expansion. The direct cause of these problems is that the construction unit did not carefully construct according to the design drawings As well as the quality of the foundation pit backfill serious failure, and the relevant design and regulatory side also worth recalling.