论文部分内容阅读
介绍了宝钢1号烧结机1986年实际生产情况及对存在问题的分析,同时叙述了生产过程采取的有关措施和提出了改进意见。
The actual production situation of Baosteel No. 1 sintering machine in 1986 and the analysis of the existing problems are introduced. Meanwhile, the relevant measures taken in the production process and the suggestions for improvement are presented.