钢丝网闸门在水利工程中是具有省钢材,耐腐蚀等优点较多的一种闸门。但是由于土建工程施工和机加工件都有误差,给施工带来一定困难。所以在以往的施工中有“十闸九漏”的说法。我工区承担清河节制闸工程,自1982年初动工,1982年3月浇筑混凝土至1982年6月18日闸门安装完毕,闸门起落自如。6月下旬蓄水高度达到3.2米时进行观查,六孔闸门全部不渗不漏,达到设计要求。现将施工操作介绍如下。
Wire mesh gate in the water conservancy project is a provincial steel, corrosion-resistant and more advantages of a gate. However, due to construction and machining of civil engineering have errors, to bring some difficulties to the construction. Therefore, in the past construction of “ten gates nine leaks” argument. I work area to undertake Qinghe control gate project, started in early 1982, in March 1982 pouring concrete until June 18, 1982 gate installation is completed, the gate landing freely. In late June when the water storage height of 3.2 meters to observe the six-hole gate impermeable, to meet the design requirements. Now the construction operations are described below.