论文部分内容阅读
我队1986年承担某水库工程地质勘察钻探施工任务,该区地处新疆北部高寒地带,冬季最低温度达-40℃,给施工带来许多困难。下面谈谈我们在这次施工中的具体作法,供大家在实际工作中参考。一、地层及设备
Our team assumed the task of drilling a geological survey of a reservoir in 1986. The area is located in the alpine region of northern Xinjiang. The minimum temperature in winter reaches -40 ℃, which brings many difficulties to the construction. Here to talk about our specific practices in this construction for your reference in the actual work. First, the formation and equipment