发电厂主厂房超长结构温度效应的弹塑性分析

来源 :电力建设 | 被引量 : 0次 | 上传用户:tianwaiyun6
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
钢筋混凝土框架结构作为大型火力发电厂主厂房结构有着良好的经济性。由于生产工艺上的要求,不允许在电厂主厂房结构内设置温度伸缩缝,使得主厂房成为超长结构。解决由于结构超长而出现过大的温度(收缩)效应是一个非常重要的课题。基于火力发电厂钢筋混凝土框架结构的基本数据,建立弹塑性模型分析超长结构的温度效应;并建立温度(收缩)作用下的裂缝宽度分析模型,研究了内置伸缩缝对降低超长框架温度(收缩)效应的影响及其有效性。 Reinforced concrete frame structure as a large-scale thermal power plant structure has a good economy. Due to the requirements of the production process, it is not allowed to set the temperature expansion joints in the main plant structure of the power plant, so that the main plant structure becomes an extra long structure. Solving the problem of excessive temperature (shrinkage) due to the long structure is a very important issue. Based on the basic data of reinforced concrete frame structure of thermal power plant, the elastic-plastic model was established to analyze the temperature effect of the ultra-long structure. The crack width analysis model under temperature (shrinkage) was established. The effect of built- Contraction) effect and its effectiveness.
其他文献
针对浅埋煤层软顶板顺槽支护困难的问题,通过在1611运输顺槽的现场支护优化,研究了锚杆、钢带、锚索网符合支护形式对软煤顶板围岩变形、应力分析、塑性区发展破坏等的影响.
本文章主要针对在建的永蓝高速公路(湖南永州-湖南蓝山),在岩溶地段修建高速公路,沉管桩是对路基在溶岩地段进行的处理方案.对在溶岩地段进行沉管桩施工提出了具体施工控制措
介绍了原文作者基于新历史条件,从图书馆释义三要素出发对高校图书馆未来发展所作的思考.
利润预测是县级供电企业的重要工作,做好利润预测关键是要做好:分类售电量的预测,小水电上网电量的预测,"边际电力购销差价空间"的预测.
目的 探讨乳腺癌患者术后焦虑、抑郁状况并分析其影响因素,并给予相应心理干预及其效果.方法 选择2010年1月-2011年12月在武钢医院住院的乳腺癌患者100例,采用SAS和SDS量表对
高校安全工作意义重大,要贯彻预防为主的原则:制定安全预案,把握安全工作主动性;强化宣传教育,提高安全防范能力;全面收集信息,增强安全预防针对性;加强安全管理,净化安全预
介绍了数控技术是用数字信息对机械运动和工作过程进行控制的技术;是制造业实现自动化、柔性化、集成化生产的基础.分析了手工编程和计算机自动编程两种数控机床编程方法,并
以异戊橡胶为基础,研究了高孔隙炉黑与石墨并用及不同增塑剂对硫化胶体积电阻率ρv的影响。少量添加硬脂酸和邻苯二甲酸二丁酯的二元填充硫化胶,其力学性能变化不大,ρv值有
乌金塘水库位于葫芦岛市女儿河的中下游,是一座综合利用的大(Ⅱ)型水库。该水库溢洪道自身存在的诸多险情,已严重危胁到水库的安全运行,经审批同意对其进行拆除重建。文章提
本文从高速公路建设项目业主的角度,借鉴建筑工程中的全过程投资控制理论,总结了高速公路建设项目投资过程中对项目决策阶段、设计阶段、招投标阶段和施工阶段、竣工阶段投资