文章以临汾市引沁入汾浮山供水工程为例,通过现场勘察,拟定了两个线路方案。针对影响供水工程输水线路的因素这一问题,主要从地形地貌、地层岩性、地质构造、水文地质、施工条件、线路长度、运行管理及工程投资等方面进行技术经济分析比较,结合供水工程勘察设计原则,线路选择的原理和方法,确定了经济合理的洞线方案。最终强调线路选择在整个工程中的重要性。
Taking Linfen City Qinfen into Fenfen Mountain water supply project as an example, through the site survey, the proposed two-line program. In view of the factors that affect the water supply line of water supply project, the technical and economic analyzes and comparison are made mainly from topography, formation lithology, geological structure, hydrogeology, construction conditions, line length, operation management and project investment. Combined with the water supply project Survey and design principles, principles and methods of route selection, to determine the economic rationality of the cave program. The final emphasis on the importance of route selection throughout the project.