论文部分内容阅读
1.鳝池建造。选择长年流水的地方建水泥池,池的面积为30~50平方米,池壁高0.8~1米,在对角处设进、出口,安装好防逃设施。2.堆好土畦。在池中堆若干条宽限1~1.5米、高20~25厘米的土畦(选用含丰富有机质的壤
1. Eel pond construction. Select long years of water to build cement pool pool, the pool area of 30 to 50 square meters, 0.8 to 1 meter high pool wall, located at the diagonal entrance, exit, install anti-flee facilities. 2. Heap soil 畦. Heap in the pool a number of grace 1 ~ 1.5 meters, 20 ~ 25 cm high soil 畦 (optional rich organic matter soil