本年下游三省防洪工程,是以防御陕州洪水二三、○○○秒公方,争取防御二九、○○○秒公方为目标,工程具体计划已经各省河务局先后编送到会,其工程设施标准:(一)河南省:(甲)堤防建设——以填垫地面凹形包淤及补修残缺为主;(乙)护岸护坡建设——石坝的石坦坡统超高一九四九年洪水位二·五至三公尺,坝基土各高于石坦坡○·五公尺为标准。(二)平原省:(甲)堤防建设——南岸大堤自东明县小温庄至高村加
The flood control projects of the three provinces in the lower reaches of this year targeted to defend the 23rd and the 2000st floods in Shaanxi and to defend the 29th and the 2000th public square. The concrete plan of the project has been compiled by provincial riverbeds successively , Its engineering facilities standards: (a) Henan Province: (a) dyke construction - to fill the ground with concave paddy sedimentation and repair incomplete; (b) revetment revetment construction - In 1949, the flood peak was 2.5 to 3 meters and the dam foundation soil was higher than the Shihut slope of ○ · 5 meters. (B) plain province: (A) dike construction - South bank embankment from Dongming County small village to high village