根据秦沈客运专线A—18标段碎石桩施工情况及结合现场施工所收集的一手资料,对测定碎石桩 加固砂粘土地基定额作了简要分析探讨,为补充高速铁路定额提供基础资料。
According to the construction condition of A-18 segment gravel pile in Qinshen Passenger Dedicated Line and the first-hand data collected in the construction of the site, a brief analysis and discussion is made on the determination of the foundation of sand-clay clays reinforced by gravel piles to provide basic data for supplementing the quota of high-speed railway.