论文部分内容阅读
在批林批孔和学习无产阶级专政理论运动的推动下,一九七五年二季度,我厂空调职工在党委组织的制冷大会战中,坚持大学大批促大干.在有关部门的配合下,完成了蒸喷制冷和冷却塔总体工程的设计和第一、二机组的安装任务.七月下旬经过试车后正式投入运行,发挥了制冷机的降温作用,运转情况良好. 当前,在深入批邓、反击右倾翻案风的大好形势下,我们总结和进一步完善这套制冷与冷却塔的综合设备.经过一个阶段的运行实践,我们体会制冷机与冷却塔的
In the second quarter of 1975, under the promotion of the approval of the Lin Piao and the study of the theoretical movement of the dictatorship of the proletariat, the air-conditioning workers of our factory persisted in the cooling general assembly organized by the Party Committee and insisted that the university promoted the universities to promote themselves. With the cooperation of relevant departments, Completed the design of the overall engineering of steam jet cooling and cooling towers and the installation tasks of the first and second units. It was officially put into operation after the trial run in late July, and played the cooling role of the refrigerator. The operation was in good condition. At present, in-depth approval Under the excellent situation of Deng and counterattack, we summed up and further improved the comprehensive equipment of this refrigeration and cooling tower. After a phase of operational practice, we experienced the chiller and the cooling tower.