水利水电工程工期长、情况复杂,施工中的索赔时有发生。通过介绍索赔出现的原因,提出了索赔处理的原则,对人员、机械、误工、冬季施工、交叉作业和材料供应等6个方面的费用补偿进行了分析,并强调了索赔的注意事项,可供从事人员参考。
Water conservancy and hydropower projects have a long construction period and complicated conditions, and construction claims have occurred from time to time. By introducing the reasons why the claim appeared, the principle of claim processing was put forward, and the compensation of six aspects such as personnel, machinery, labor loss, construction in winter, cross-operation and material supply were analyzed. The compensation claims under consideration were highlighted. Engaged in staff reference.