论文部分内容阅读
通过对整个系统的认真分析和合理的修改,厂用电系统的安全倒换问题得以解决,试验结果达到修改要求,提高了厂用电系统的可靠性。
Through careful analysis of the entire system and reasonable modifications, the safety switching problem of the power system of the plant can be solved, the test results meet the modification requirements, and the reliability of the power system of the plant is improved.