论文部分内容阅读
图1在#2激光区#4组安装框架装置单元图2在#2激光区#3组主放大器顶部安装闪光灯电缆图3在#2配电间流动反射镜诊断装置上建造外罩图4通过靶区和#2配电间之间的墙壁安装光束管道图5在#3电容器区安装第一个电容器组件图6在#3电容器区电容器组件水平上的电缆底架上安装闪光灯电缆图7
Figure 1 Installing the frame unit in the # 2 laser zone # 4 group Figure 2 Installing the flash cable on top of the # 2 laser zone # 3 main amplifier Figure 3 Building the cover on the # 2 distribution flow mirror diagnostic unit Figure 4 Passing the target Figure 5 Installing the first capacitor assembly in the # 3 capacitor section Figure 6 Installing the flash cable on the cable chassis in the # 3 capacitor section capacitor assembly level Figure 7