广西天盛大型进口煤炭煤配基地项目位于钦州港果子山作业区内,一期工程建设7万吨煤炭专用码头一座,设计煤堆场面积25万m2,配置两台1250吨/小时卸船机,煤堆场16个,可同时堆载40万吨煤炭,年设计吞吐能力为400万吨,总投资为6亿元人民币。
Guangxi Tiansheng large imported coal coal base project is located in Qinzhou Port Fruit Hill operating area, a project to build 70,000 tons of coal for a dock, the design of coal yard area of 250,000 m2, equipped with two 1250 tons / hour ship unloader , 16 coal yard, can simultaneously load 400000 tons of coal, annual design throughput of 4000000 tons, with a total investment of 600000000 yuan.