担负省重点工程安阳电厂八期改扩建工程2×300MW机组安装任务的河南火电二公司干部职工,遵照省局领导“早上马,快发电,缓解河南用电紧张局面”的指示精神,在施工准备尚很不具备开工条件的情况下,充分发挥人的主观能动性,坚持“以施工促条件”,于1996年3月15日吊装第一根钢架,实现了象征性开工。继而,河南火电二公司安阳工程公司边组织、边进人、边临建、边施工,克服了施工场是最小(仅14.7亩)、相隔距离远,以及图纸设备到货严重滞后等重重困难,仅用91天就完成了9号炉5层钢架吊装验收。鸣金声未已,战鼓催又征,安阳工程公司自我加压,于9月2日又响亮提出了“10月底退塔吊,实现大件吊装基本结束”的奋斗目标,一场新的激战开始了。
The cadres and workers of the Henan Thermal Power Second Company, who are responsible for the installation of the provincial key project Anyang Power Plant Phase 8 reconstruction and expansion project with 2×300MW units, follow the instructions of the provincial bureau’s leader “Mr. Morning, Fast Electricity Generation, Relieving Electricity Consumption in Henan”, and are preparing for construction. In the absence of conditions for start-up, we gave full play to people’s subjective initiative and insisted on “promoting conditions for construction”. On March 15, 1996, the first steel frame was hoisted to achieve a symbolic start. Then, Anyang Engineering Co., Ltd. of Henan Thermal Power Co., Ltd. organized, entered people, built constructions along the edge, and edged constructions, overcoming difficulties such as the smallest construction site (only 14.7 acres), long distances, and severe delays in the arrival of drawings and equipment. In just 91 days, the inspection and acceptance of the 9-story 5-story steel frame was completed. The sound of gold rang, the war drums urging them to levy, and Anyang Engineering Co., Ltd. was self-pressurizing. On September 2nd, it loudly proposed the goal of “retreating from the tower crane at the end of October to realize the basic completion of large-scale hoisting”. A new fierce battle began. .