加拿大安大略电力公司的尼亚加拉隧洞长10.2 km,内径12.7 m,用于从霍斯舒瀑布上游的尼亚加拉河引水到昆斯顿附近的现有阿达姆贝克爵士电站。设计和施工承包商斯特拉贝格使用世界上最大的硬岩隧洞掘进机开挖该隧洞。对修建隧洞的决策背景、工程所处的地质环境、隧洞及其相关建筑物的设计与施工等情况作了较为详细的介绍。
The Ontario Electricity Company’s Niagara Tunnel, which is 10.2 km long and has an inside diameter of 12.7 m, is designed to divert water from the Niagara River upstream of Hoshu Falls to the existing Sir Adam Beck Power Station near Queenstown. Design and construction contractor Straubberg used the world’s largest hard rock tunnel boring machine to excavate the tunnel. The construction of the tunnel’s decision-making background, the project in the geological environment, tunnels and related buildings design and construction of a more detailed description.