论文部分内容阅读
后张法预应力施工技术在我国桥梁工程建设项目中已广为推广,随着近年来高速公路行业的不断发展和建设投入的不断增加,大型施工企业承包的项目越来越全面,常常在每个项目中包含各种各样不同结构不同实际情况的桥梁。该文通过在建的某高速公路项目对现浇连续梁及其预应力施工的灵活把握与应用进行了切合实际的分析与介绍。
After the post-tensioning method of prestressed construction technology in China’s bridge construction projects have been widely promoted, with the continuous development of the highway industry in recent years and increasing investment in construction, large-scale construction projects contracted by contractors more and more comprehensive, often in each The project contains a variety of bridges of different structures and different realities. This paper presents a practical analysis and introduction of flexible control and application of cast-in-situ continuous beams and their prestressed construction through a highway project under construction.