论文部分内容阅读
混凝土坝顶部的垂直位移,主要受温度变化时材料热胀冷缩的影响。当坝体混凝土温度场已经稳定只随季节变化时,坝顶高程一般都是夏秋上抬,冬春下降,在一定变化范围内作周期变动。但是四十年代投入运用的我国东北丰满重力坝(图1),其坝顶垂直位移却出现了一种特殊情况:从1959年开始系统观测到1979年二十年间,左岸坝段和河床坝段抬高了 The vertical displacement of concrete dam top is mainly affected by the material’s thermal expansion and contraction when the temperature changes. When the dam concrete temperature field has been stable only with seasonal changes, the crest elevation are generally summer and fall lift, winter and spring decline, make changes within a certain range of cyclical changes. However, in the 1940s, the vertical displacement of the Fengman dam in northeastern China (Figure 1), which was put into operation in the 1940s, showed a special situation. From the system observation of 1959 to the twentieth year of 1979, the left bank dam section and riverbed dam section Elevated
其他文献
本文讨论了高速柴油机喷嘴流量的随线检测与控制的方法,并对PLK93-1型检测仪器进行了介绍。 This article discusses the high-speed diesel nozzle flow line detection an
我院从1986年6月至1998年5月,应用日本产01ympus-p10及电子胃镜(230)检查了510例儿童,现报告如下。 1 临床资料 1.1 一般资料:本组510例中,男性360例,女性150例,男女之比为2
我科自1996年3月~1999年3月,共收治小儿烧伤患者246例,其中烧伤总面积(TBSA)≥30%或Ⅲ度》6%的共有31例,经积极有效的治疗后均痊愈出院。现总结如下:1 临床资料1.1 一般资
目前,世界上将防洪措施通常分成两类,一类叫工程防洪措施;一类叫非工程防洪措施。工程防洪措施包括修建水库、滞蓄洪区,修筑堤防,整治河道,开辟分洪道以及修建大型泵站等防
18世纪的欧洲,正歌剧为贵族及上流阶层的人们所喜爱和追捧,但随着法国大革命的爆发,当时社会思潮也逐渐产生了改变,喜歌剧开始逐渐登上了历史舞台,推翻了正歌剧的古板表演形
为了了解水流流速脉动影响流速的范围,找出适当的观测时间,以避免脉动的影响,我们于今年一、三、五月作了四次共三十九线的试验,施测时将流速仪固定于○·六水深处连续施测
一、基本情况 (一)概况徒骇河位于黄河下游北岸,东临渤海,西源于河南省,北界马颊、德惠新河流域,南以黄河的金堤、临黄堤为界。干流自河南省苇县文明寨起,流经聊城、德州、
2月28日,平罗县委书记杜迁、县人大副主任李治民、副县长朱敏、政协副主席顾自军一行到自治区林业局进行2013年生态林业项目对接工作。县委书记杜迁首先感谢自治区林业局对平
流域汇流曲线都可视为圣维南方程组的简化,简化假定的优劣,最终都以对实测洪水的的还原及验算精度为标准。列入设计洪水规范的瞬时单位线,本身存在着一些缺陷:例如矩法参数