论文部分内容阅读
针对羊头铺水电站在消能结构方面的设计优化进行了物理模型试验。采用二级复式消能结构能较好的解决泄流消能的问题,保证下泄流速在相对安全的范围内。所取得的试验成果对工程设计有一定的指导意义。
A physical model test was conducted to design and optimize the structure of Shengtoupu Hydropower Station. The use of two-stage multi-energy dissipation structure can better solve the problem of discharge energy dissipation and ensure the discharge velocity is within a relatively safe range. The experimental results obtained have certain guiding significance for engineering design.