结合新建兰新铁路DK786+280~DK786+400和DK786+980~DK787+080段路基实际情况,进行了戈壁地段水泥改良土填筑工艺试验研究,并对检测数据进行了分析,根据试验效果得出了一些有益的结论,对实际施工具有指导意义。
According to the actual conditions of the subgrade of DK-Lan-Xin-Xin Railway DK786 + 280 ~ DK786 + 400 and DK786 + 980 ~ DK787 + 080, the cement-improved soil filling technology of Gobi section was studied and the test data were analyzed. According to the experimental results Some useful conclusions have been made, which are instructive to practical construction.