受顶管施工影响的土体扰动分析与实测研究

来源 :地下空间与工程学报 | 被引量 : 0次 | 上传用户:haifeng123456789
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
近年来,顶管施工引起的土体扰动特性研究越来越重要。通过分析顶管施工过程地表位移的分阶段扰动机理,将顶管推进过程中的地表位移分为四个阶段:前期波动阶段、隆起阶段、施工沉降阶段和后期固结沉降阶段。本文利用上海世博电力隧道工程的土压力、孔隙水压力、深层水平位移和地下水位实测数据,分析顶管施工引起的土体扰动特性,研究表明,顶管施工中的开挖面稳定和泥浆套技术对土体扰动有较大影响。 In recent years, the research on soil disturbance caused by pipe jacking is more and more important. By analyzing the staged disturbance process during the pipe jacking process, the surface displacement during the pipe jacking process is divided into four stages: the pre-stage fluctuation stage, the uplift stage, the construction subsidence stage and the post-consolidation settlement stage. Based on the data of earth pressure, pore water pressure, deep horizontal displacement and groundwater table of the Shanghai World Expo’s power tunneling project, this paper analyzes the soil disturbance characteristics caused by pipe jacking. The results show that the excavation surface is stable and the mud cover Technology has a greater impact on soil disturbance.
其他文献
目前我国立井井筒频繁发生非采动破坏,在修复后一段时间又发生重复破坏,给我国煤炭行业带来了巨大的损失。而竖直附加力被认为是造成该种情况的主要原因。针对这种情况,以实
秋季是落枕、颈椎病、咽喉炎症等疾病的高发季节,专家建议读者朋友不妨试试颈部的火罐疗法.rn落枕——走罐+艾灸rn秋季是落枕频发时节,对于风寒阻络型的落枕,使用火罐疗法较
期刊
我们知道,中医有“六淫”之说,也就是六邪.这当中,以风为首,说“风为百病之长”.所以,中医对风是非常注意的.在长期的摸索当中,人们发现,在人体当中有很多地方很容易遭受风的
固结试验确定固结系数常采用时间平方根法和时间对数法,这两种方法均为作图法,其缺点是在绘图时易掺杂人为因素的影响,因而应用繁杂且误差较大。从一维固结理论出发,结合最小
铁老把自己88岁时写的一个歌诀称之为《八卦掌养生行功歌》(亦称《八卦走转养生行功歌诀》):rn简易松无缓,环行神意凝.rn气聚身沉抱,智觉妙感通.rn离名空相寂,一巧任从容.rn
首先建立双向压缩条件下形成单一闭合裂纹的力学模型,考虑摩擦力的影响,计算出裂纹面的正应力和剪应力。分别运用有效剪应力准则和最大周向应力准则计算裂纹的初始断裂角。运
为了研究水下公路隧道在水平地震动和竖直地震动作用下结构的安全可靠性,采用快速拉格朗日时域有限差分法进行时程分析,并利用大型岩土软件FLAC3D对某浅埋软土地基水下公路隧
建立了越流承压含水层在循环抽水的地下水运动数学模型,用Heaviside函数性质及Laplace变换求解得该数学模型关于承压含水层水位变化的解析表达式,进而求得承压层压缩变形。通