当今世界抽水蓄能机组的发展方向就是高水头化、大容量化、高转速化、可调速化。至今为止,世界投运的最高水头为676m、216MW(恰依拉),最大容量为457MW(巴斯康蒂)、最高转速为600r/min、216MW(恰依拉等)。由日本日立公司生产的用于东京电力公司葛野川蓄能电站的水头为728m、容量为475MVA、转速为500r/min的蓄能机组堪称世界最高水头和最大容量级的高转速抽水蓄能机组,已于1996年6月开始在工地安装,电站下部、尾水管等已装完,1997年4月安装蜗壳等以及水泵水轮机主机,预计年底装完并于1998年投运。
In today’s world, the development direction of the pumped storage unit is high watering, large capacity, high speed, speed control. To date, the world’s highest operating head is 676m and 216MW, with a maximum capacity of 457MW and a maximum speed of 600r / min and 216MW. The storage unit produced by Japan’s Hitachi for the Tokyo Electric Power Company Geyechuan Pumped Storage Station has a head of 728m, a capacity of 475MVA and a speed of 500r / min, making it the world’s highest head and largest high-speed pumped storage unit It was installed in the construction site in June 1996, and the lower part of the power station and tail pipe have been installed. In April 1997, the volute and other turbines and turbines were installed. It is expected to be completed by the end of the year and put into operation in 1998.