十三陵蓄能电厂装有四台20万千瓦抽水蓄能机组,自1995年12月第一台机组建成投产以来,在发挥抽水蓄能机组原有特点和性能的基础上,我厂对机组主辅设备不断进行技术改造和创新,努力发掘并完善抽水蓄能机组特有的特点,充分发挥其调频、调峰和事故备用的作用,为电网的安全稳
The Shisanling Pumped Storage Power Plant is equipped with four 200kW pumped storage units. Since the first unit was put into operation in December 1995, based on the original features and performance of the pumped storage units, The main and auxiliary equipment continue to carry out technological innovation and innovation, and strive to explore and improve the unique characteristics of pumped storage units, give full play to its FM, peak shaving and accident backup role for the safety of power grid