论文部分内容阅读
阐述了溜放车组间隔控制在自动化驼峰中的重要性,并以TW-2型驼峰自动化系统为例说明了二部位间隔控制的基本原理,以及具体实现的3个主要步骤:基本定速的计算、“朝前看”间隔调整和“朝后看”间隔调整。
The importance of the interval control of the car and the car group in the automatic hump is described. The basic principle of the interval control of the two parts and the three main steps of the realization are described by taking the TW-2 hump automatization system as an example: Calculate, “look ahead ” interval adjustment and “look back ” interval adjustment.