论文部分内容阅读
对应用于现场监测软基喷射混凝土衬砌隧道的仪器设备进行了评价 ,讨论了仪器和监测可能起的作用 ,阐述了影响有效现场监测仪器选择的主要因素。建议采用的对策是 ,采用小核心的仪器 (这些仪器可靠性为人所知 ) ,而不是采取几种扩散式仪器和技术 ,在必要时使用更精密的仪器
The equipment used in on - site monitoring of soft - lining shotcrete lining tunnel was evaluated. The possible functions of instrumentation and monitoring were discussed. The main factors influencing the selection of effective on - site monitoring instrumentation were described. The suggested countermeasure is to use a small core of instruments known to the reliability of these instruments instead of using several diffuse instruments and techniques and using more sophisticated instruments where necessary