论文部分内容阅读
针对生产建设项目施工临时占地的变更、恢复,以及土地复垦质量等问题,立足法律法规和规范性文件要求,结合生产建设项目水土保持设施验收技术评估工作实践,总结了规范施工临时占地变更手续、加强土地复垦质量等的对策,并提出在水土保持设施验收技术评估中区别处理临时占地恢复等问题的要点。
According to the requirements of laws and regulations and normative documents, combined with the acceptance assessment of soil and water conservation facilities in production and construction projects, aiming at the problems such as the alteration and restoration of temporary land occupation of construction and production projects and the quality of land reclamation, Change procedures and strengthening the quality of land reclamation, and put forward the main points that should be dealt with separately in temporary land reclamation and other issues in the technical appraisal of soil and water conservation facilities acceptance.