沅陵沅水二桥承台施工水位高,最大水深39 m,水压大,且水流湍急,最大流速达6 m/s,属于深水桥梁基础承台施工,施工难度大、安全和质量风险高。采用有底钢套箱在陆地加工场内加工和拼装,再运至预定地点的方案,有效防止污染水源和环境,保障了施工作业人员、机械和设备材料的安全,工程达到了预期的目标。有底钢套箱是深水桥梁承台施工的实用技术。
Yuanling Yuanshui No.2 bridge cap is of high water level with a maximum water depth of 39 m. The water pressure is large and the water current is turbulent. The maximum flow rate reaches 6 m / s. It belongs to the foundation cap of deepwater bridge and is of high construction difficulty and high safety and quality risk . The project of processing and assembling the finished steel box in the on-site processing ground and then transporting it to the planned site effectively prevented the pollution of water sources and the environment, ensured the safety of construction workers, machinery and equipment materials and achieved the expected goal. Steel box with the end of the deep water bridge cap construction practical technology.